Herschel Status Report - June/July 201211 Jul 2012 16:59 Report for period 21 June to 4 July 2012 Mission operations of the Herschel space observatory continued nominally during the reporting period, with the spacecraft and subsystems all performing as expected.
SpacecraftThe spacecraft continues to be in good health and is operating nominally. PayloadOperations for all three instruments, PACS, SPIRE and HIFI, have been nominal during the reporting period. Occasional HIFI single event upsets (SEUs) were routinely handled via standard procedures and had no impact on the science observations. The efficiency of scheduling Herschel's observations remains high and the average time of executing observations during the past year (19.3 hours per day) remains well above the mission baseline of 18.0 hours per day. Ground SegmentGround segment operations have been nominal and 100% of the data continues to be recovered. As of 29 June 2012, the approximate completion of the different programme parts was:
For more details of the different programme parts, see the "overview of Herschel observing" linked from the right-hand menu.
A routine station-keeping manoeuvre, or orbit correction manoeuvre, was successfully performed on 22 June. These routine manoeuvres ensure the Herschel spacecraft maintains its correct orbit about L2. In the night from Saturday 30 June to Sunday 1 July a leap second was introduced. To accommodate this in operations an additional pass was arranged with ESA's Perth ground station.
Archiving The fourth bulk reprocessing of all archived Herschel data, which began at the end of April, has completed for the SPIRE and HIFI observations. Processing of PACS archival observations is ongoing, and will be followed by extended processing which combines data from independent observations and instruments. The entire exercise is expected to be completed by the end of July. Future Milestones
---