• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • Venus Express

    • Missions
    • Show All Missions
    • Mission Home
    • Summary
    • Fact Sheet
    • Objectives
    • Mission Team
    • Orbit View
    • Background Science
    • Venus vs Earth
    • Venus Transits
    • Spacecraft
    • 3D Model
    • Instruments
    • Engineering
    • Mission Operations…

      • Launch Vehicle
      • Launch Campaign
      • Launch Phase
      • Cruise Phase
      • Orbit Insertion
      • Operational Orbit
      • ESOC info
      • Status Reports
    • Science Operations
    • Venus Express Science Operations
    • Data Archive
    • Resources
    • News Archive
    • Multimedia Gallery
    • Publication Archive
    • Status Report Archive
    • Calendar of Events
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    No. 164 - Quadrature Operations

    06 Jan 2009 11:31

    Report for Period 28 December 2008 to 3 January 2009

    Nominal operations were conducted during the reporting period. The spacecraft is currently in quadrature phase, when the Sun-Spacecraft-Earth angle is between 75° and 95°.

    VIRTIS continues to be operated in the visual channels only. Radio Science Investigation (RSI) occultation measurements were taken during three ground station passes in the reporting period.

    DDOR
    On 28 December delta differential one-way ranging (DDOR) was performed using the New Norcia and Cebreros ground stations to track the spacecraft. These measurements are performed monthly to support the accurate determination of the ephemeris for the planet Venus that is maintained by NASA's Solar System Dynamics Group.

    The DDOR measurement principle uses a technique to highly accurately determine the position of a transmitter in space and relies on observing the time delay between reception of the signal from the transmitter by two ground stations at different positions on Earth. In this case the Venus Express spacecraft is the transmitter and the two ground stations are New Norcia in western Australia and Cebreros in Avila, Spain.

    The table below shows a chronology of the main activities:

    MET (Day) Date DOY Main Activity
    1146 28/12/08 363

    Communications pass over Cebreros.
    DDOR with Cebreros and New Norcia

    1147 29/12/08 364

    Communications pass over Cebreros.
    RSI occultation measurements pass over New Norcia

    1148 30/12/08 365

    Skipped communications pass over Cebreros

    1149 31/12/08 366

    Communications pass over Cebreros.
    RSI occultation measurements pass over New Norcia

    1150 01/01/09 001

    Communications pass over Cebreros.
    RSI occultation measurements pass over New Norcia.

    1151 02/01/09 002

    Skipped communications pass over Cebreros.

    1152 03/01/09 003

    Communications pass over Cebreros.

    At the end of the last Cebreros pass in the reporting period (DOY 003) Venus Express was orbiting Venus at 115.13 million km from the Earth. The one-way signal travel time was 383.8 seconds.

    Payload Activities

    ASPERA
    The instrument was regularly operated as part of the routine plan.

    MAG
    The instrument was regularly operated as part of the routine plan.

    PFS
    The instrument was not operated during the reporting period.

    SPICAV
    The instrument was regularly operated as part of the routine plan.

    VeRA
    RSI occultation measurements were taken during the reporting period on DOY 364, 366 and 001 with the New Norcia ground station.

    VIRTIS
    The instrument was regularly operated as part of the routine plan.
    VIRTIS is operated in the visual channels only.

    VMC
    The instrument was regularly operated as part of the routine plan.

    Future Milestones

    • VIRTIS cooler test on 10 January 2009.
    • High gain antenna swap from HGA1 to HGA2 on 13 January 2009.
    • The quadrature phase will end on 25 January 2009.
    • Commissioning of the Reaction Control Subsystem B on 12 February 2009.
    • Battery Deep Discharge Test is planned for 22 April 2009.
    • Start of next (outbound) quadrature phase on 29 May 2009.

    ---
    Legal disclaimer
    This report is based on the ESOC mission operations report, MOR #164. Please see the copyright section of the legal disclaimer (bottom of this page) for terms of use.


    Last Update: 23 Jan 2009

    • Shortcut URL
    • http://sci.esa.int/jump.cfm?oid=44017
    • Status Reports
    • Archives

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions