• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • Venus Express

    • Missions
    • Show All Missions
    • Mission Home
    • Summary
    • Fact Sheet
    • Objectives
    • Mission Team
    • Orbit View
    • Background Science
    • Venus vs Earth
    • Venus Transits
    • Spacecraft
    • 3D Model
    • Instruments
    • Engineering
    • Mission Operations…

      • Launch Vehicle
      • Launch Campaign
      • Launch Phase
      • Cruise Phase
      • Orbit Insertion
      • Operational Orbit
      • ESOC info
      • Status Reports
    • Science Operations
    • Venus Express Science Operations
    • Data Archive
    • Resources
    • News Archive
    • Multimedia Gallery
    • Publication Archive
    • Status Report Archive
    • Calendar of Events
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    No. 63 - Earth Occultation Observations

    31 Jan 2007 09:47

    Report for Period 21 January to 27 January 2007

    During the reporting period the mission operations have been conducted according to the plan. Science operations have been nominal. Radio science activities with the New Norcia ground station have been conducted as planned.

    The table below shows a chronology of the main activities in the reporting period:

    MET (Day) Date DOY VPER# Main Activity
    439 21/01/07 021 275 Routine Mission Operations
    440 22/01/07 022 276 Routine Mission Operations
    441 23/01/07 023 277 Routine Mission Operations
    442 24/01/07 024 278 Routine Mission Operations
    443 25/01/07 025 279 Routine Mission Operations;
    TM bitrate change
    444 26/01/07 026 280 Routine Mission Operations
    445 27/01/07 027 281 Routine Mission Operations

    At the end of the last Cebreros pass in the reporting period (DOY 027, 17:00z) Venus Express was orbiting Venus at 229 million km from the Earth. The one-way signal travel time was 763 seconds.


    Payload Activities

    ASPERA
    The instrument is regularly operated as part of the routine plan.

    MAG
    The instrument is regularly operated as part of the routine plan.

    PFS
    This instrument is OFF and is not operated.

    SPICAV
    The instrument is regularly operated as part of the routine plan.

    VeRA
    The USO has been unmuted on DoY 022, 024 and 026 to conduct the planned Earth occultation observations.

    VIRTIS
    The instrument is regularly operated as part of the routine plan.

    VMC
    The instrument is regularly operated as part of the routine plan.


    Mission Planning

    Short Term Planning
    Operations of STP038 were executed successfully and the planning of STP039 was completed in time.

    Long Term Planning
    At the VMOC-VSOC planning telecom, it was decided that a new FECS will be produced this week, with updated pass times, and a new definition of the 'Start Dump' event (the current 3000 second margin will be substantially reduced). The FECS file, contains the list of the downlink and radio science opportunities from the available ground stations.


    Future Milestones

    The definition and testing of operations during quadrature is on-going; the next quadrature phase will start in May 2007.


    Last Update: 09 May 2007

    • Shortcut URL
    • http://sci.esa.int/jump.cfm?oid=40607
    • Status Reports
    • Archives

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions