• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • Venus Express

    • Missions
    • Show All Missions
    • Mission Home
    • Summary
    • Fact Sheet
    • Objectives
    • Mission Team
    • Orbit View
    • Background Science
    • Venus vs Earth
    • Venus Transits
    • Spacecraft
    • 3D Model
    • Instruments
    • Engineering
    • Mission Operations…

      • Launch Vehicle
      • Launch Campaign
      • Launch Phase
      • Cruise Phase
      • Orbit Insertion
      • Operational Orbit
      • ESOC info
      • Status Reports
    • Science Operations
    • Venus Express Science Operations
    • Data Archive
    • Resources
    • News Archive
    • Multimedia Gallery
    • Publication Archive
    • Status Report Archive
    • Calendar of Events
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    No. 57 - Routine Science Operations

    14 Dec 2006 17:36

    Report for Period 3 December to 9 December 2006

    During the reporting period the mission operations have been conducted according to the plan.

    Some problems were experienced with the communications between ESOC and Cebreros, and between ESOC and Villafranca, resulting in a very short pass on DOY 339.

    The table below shows a chronology of the main activities in the reporting period:

    MET (Day) Date DOY VPER# Main Activity
    390 03/12/06 337 226 Routine mission operations
    391 04/12/06 338 227 Routine mission operations
    392 05/12/06 339 228 Routine Mission operations.
    Communications from ESOC to Cebreros and to Villafranca were temporarily down. Once restored, only 1 hour of pass was left on this day and no science dumps were made
    393 06/12/06 340 229 Routine mission operations
    394 07/12/06 341 230 Routine mission operations
    395 08/12/06 342 231 Routine mission operations
    396 09/12/06 343 232 Routine mission operations

    At the end of the last Cebreros pass in the reporting period (DOY 343, 16:00z) Venus Express was orbiting Venus at 250 million km from the Earth. The one-way signal travel time was 835 seconds.


    Payload Activities

    ASPERA
    The instrument is regularly operated as part of the routine plan.

    MAG
    The instrument is regularly operated as part of the routine plan.

    PFS
    This instrument is OFF and is not operated.

    SPICAV
    The instrument is regularly operated as part of the routine plan.

    VeRA
    The USO is nominally powered but muted. From S/C point of view the RSI activity of this week was performed nominally.

    VIRTIS
    The instrument is regularly operated as part of the routine plan. 

    VMC
    The instrument is regularly operated as part of the routine plan.


    Mission Planning

    Short Term Planning
    Operations of STP031 were executed successfully and the planning of STP031 was completed in time. 

    Medium Term Planning
    The planning for MTP011 has been completed successfully, the activities have been approved.


    Future Milestones

    The second Earth occultation season has started with additional Radio Science operations with the ESA New Norcia station.

    Planning of the entire Christmas period will be completed next week (STPs 34 through 37, plus MTPs 11 and 12).

    An Orbit Correction Manoeuvre is to be performed at pericenter passage on 15 December, followed by a touch-up manoeuvre on 21 December.


    Last Update: 14 Dec 2006

    • Shortcut URL
    • http://sci.esa.int/jump.cfm?oid=40453
    • Status Reports
    • Archives

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions