• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • Venus Express

    • Missions
    • Show All Missions
    • Mission Home
    • Summary
    • Fact Sheet
    • Objectives
    • Mission Team
    • Orbit View
    • Background Science
    • Venus vs Earth
    • Venus Transits
    • Spacecraft
    • 3D Model
    • Instruments
    • Engineering
    • Mission Operations…

      • Launch Vehicle
      • Launch Campaign
      • Launch Phase
      • Cruise Phase
      • Orbit Insertion
      • Operational Orbit
      • ESOC info
      • Status Reports
    • Science Operations
    • Venus Express Science Operations
    • Data Archive
    • Resources
    • News Archive
    • Multimedia Gallery
    • Publication Archive
    • Status Report Archive
    • Calendar of Events
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    No. 54 - Routine Science Operations

    21 Nov 2006 09:24

    Report for Period 12 November to 18 November 2006

    During the reporting period the mission operations have been conducted according to the plan. Science operations have been resumed nominally after the end of the solar conjunction and the work-around for the TM burst generation in VIRTIS seems to be effective.

    On DoY 318 a problem in the ground station has caused the loss of the complete ground station pass. This has had no effect on the operations.

    The table below shows a chronology of the main activities in the reporting period:

    MET (Day) Date DOY VPER# Main Activity
    369 12/11/06 316 205 Routine Mission operations
    370 13/11/06 317 206 Routine Mission operations
    371 14/11/06 318 207 Routine Mission operations, pass skipped due to GS failure
    372 15/11/06 319 208 Routine Mission operations
    373 16/11/06 320 209 Routine Mission operations
    374 17/11/06 321 210 Routine Mission operations
    375 18/11/06 322 211 Routine Mission operations

    At the end of the last Cebreros pass in the reporting period (DOY 322, 16:00z) Venus Express was orbiting Venus at 254 million km from the Earth. The one-way signal travel time was 850 seconds.


    Payload Activities

    ASPERA
    The instrument is regularly operated as part of the routine plan.

    MAG
    The instrument is regularly operated as part of the routine plan.

    PFS
    The instrument is OFF and is not operated.

    SPICAV
    The instrument is regularly operated as part of the routine plan.

    VeRA
    The USO is nominally powered but muted. RSI operations, when conducted, are done with TTC chain 1, meaning without USO.

    VIRTIS
    The instrument is regularly operated as part of the routine plan.

    VMC
    The instrument is regularly operated as part of the routine plan.


    Mission Planning

    Short Term Planning
    Operations of STP028 were executed successfully and the planning of STP029 was completed in time.

    The science data dump has been delayed by a missed ground station contact on DoY 318 but no data has been lost.

    Medium Term Planning
    MTP010 planning has been successfully completed.

    Long Term Planning
    A decision whether to request DSN support for the movie observation, to be performed in April 2007, has not been taken yet.


    Future Milestones

    The nominal spacecraft configuration and the mission operations are being fully resumed after the superior conjunction phase. The normal pace of operations will now be followed again.

    The second Earth occultation season will start in December with additional Radio Science operations with the ESA New Norcia station.


    Last Update: 21 Nov 2006

    • Shortcut URL
    • http://sci.esa.int/jump.cfm?oid=40404
    • Status Reports
    • Archives

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions