• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • SMART-1 Lunar Impact

    • Missions
    • Show All Missions
    • Lunar Impact
    • Impact Schedule - 01 September
    • Impact Science
    • Observing the Moon around Impact
    • SMART-1 Impact Site Visibility from Earth
    • Participating Observatories
    • News
    • Results from Observations
    • SMART-1 Mission
    • Pre-Launch
    • Launch
    • Earth Bound
    • Moon Bound
    • Status Reports
    • SMART-1 Links
    • ESA Portal
    • SciTech
    • AMIE Camera
    • SPEDE
    • D-CIXS
    • Swedish Space Corporation
    • Bookmark and Share

    SMART-1 Pre-Launch Activities

    This page provides an overview of the key events during the early phases of the SMART-1 mission. From the definition of the mission, through the spacecraft development and testing, up to the shipment of the completed spacecraft to Kourou from where SMART-1 was launched.

    June 1998 - Response to SMART-1 AO

    News: SMART-1 experiment proposals

    November 1998 - SPC approves the mission baseline

    News: SMART-1 mission baseline endorsed

    November 1999 - SMART-1 enters development phase

    News: SMART-1 mission finalised by SPC

    June 2000 - Building the SMART-1 mock-up

    News: First spacecraft model is assembled

    Spring 2001 - Building the SMART-1 structural model

    The STM takes shape

    On 13 March 2001, SMART-1 began to take shape as assembly of the structural model (STM) began at the APCO integration facility in Vevey, Switzerland.

    By the end of March, the STM was shipped to Saab-Ericsson-Space, in Linköping, Sweden, where they proceeded with the integration of the complete SMART-1 STM.

    News: Structural model takes shape

    Summer 2001 - SMART-1 structural model testing at ESTEC

    Testing of the STM

    A series of tests were performed on the SMART-1 structural model during the early summer of 2001. In particular, acoustic, vibration and shock tests were carried out at ESTEC in order to test the structural integrity of the SMART-1 design.

    News: SMART-1 passes its vibration test

    Summer 2003 - Final Tests of the Flight Model

    Deploying solar panel

    The spacecraft

    Test equipment

    Summer 2003 - Preparing Flight Model for Shipment

    The ion drive

    Lowering onto cradle

    Prepare for transport

    Summer 2003 - SMART-1 passes Flight Readiness Review

    Following the confirmation of SMART-1's readiness for shipment, by the Mission Flight Acceptance Review (MFAR) board meeting on 8 July 2003, the spacecraft was transported from ESTEC to Amsterdam Schiphol Airport on 14 July. From there the spacecraft was flown to Kourou on an Antonov 124 cargo plane.


    Last Update: 23 Aug 2006

    • Shortcut URL
    • http://sci.esa.int/jump.cfm?oid=39837

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions