• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • SMART-1

    • Missions
    • Show All Missions
    • Mission Home
    • Summary
    • Fact Sheet
    • Objectives
    • Mission Team
    • Orbit View
    • Presentations
    • Background Science
    • Electric Spacecraft Propulsion
    • Moon
    • Spacecraft
    • 3D Model
    • Instruments
    • Mission Operations
    • Launch Vehicle
    • SMART-1 Launch Campaign
    • Launch Phase
    • Lunar Capture
    • Lunar Orbit
    • Lunar Impact
    • Status Reports
    • Mission Background
    • Science Operations
    • Data Archive
    • Resources
    • News Archive
    • Multimedia Gallery
    • Publication Archive
    • Calendar of Events
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    Lunar Capture

    On 11 November 2004 at 10:30 UTC, close to the 331st Earth apogee, SMART-1 was at the first Lagrange point of the Earth-Moon system, where the orbit is neither Earth, nor Moon bound. SMART-1 then crossed over to the region where the Moon's gravitational pull on the spacecraft is stronger than that of the Earth and was on its way to lunar capture.

    Spiralling down to operational orbit

    In its 332nd orbit around the Earth, after three weeks of unpowered flight, the electric propulsion (EP) drive was fired on 15 November at 05:24 UT, to bring the spacecraft into lunar orbit. Roughly 12 hours later, at 17:48 UT, SMART-1 had its first perilune passage.

    This first burn in a series of EP firings, lasted 108 hours and ended on 19 November 2004 at 17:48 UTC. Over the next three months, periodic firing of the EP resulted in the continuous reduction of the orbit's semi-major axis, allowing SMART-1 to reach its operational orbit around the Moon.


    Copyright ESA

    SMART-1 and Moon orbit for the period 2-20 November 2004, during which the spacecraft crossed the first Lagrange point of the Earth-Moon system. (Click image for hi-res version)

    The following table lists the dates of the first 12 perilune passages as well as the period between two sequencial passages. It shows the steady decrease in orbital period caused by the lowering of SMART-1's orbit.

    Event Day and Time (UTC) Period (h)
    Perilune Passage 1

    15-11-2004 @ 17:47:38.762Z

    89
    Perilune Passage 2 19-11-2004 @ 11:01:02.127Z 75
    Perilune Passage 3 22-11-2004 @ 14:29:38.449Z 69
    Perilune Passage 4 25-11-2004 @ 11:36:11.520Z 59
    Perilune Passage 5 27-11-2004 @ 22:42:28.011Z 59
    Perilune Passage 6 30-11-2004 @ 01:59:00.054Z 51
    Perilune Passage 7 01-12-2004 @ 23:25:21.011Z 46
    Perilune Passage 8 03-12-2004 @ 16:05:27.002Z 41
    Perilune Passage 9 05-12-2004 @ 05:08:18.135Z 37
    Perilune Passage 10 06-12-2004 @ 15:08:27.116Z 34
    Perilune Passage 11 07-12-2004 @ 22:40:07.437Z 31
    Perilune Passage 12 09-12-2004 @ 04:08:57.443Z 29

    Between 10 and 18 January 2005 the EP operations were temporarily interrupted to estimate the remaining fuel and plan accurately for a mission extension. After this period, the periodic firing of the EP resumed and SMART-1 reached its operational orbit on 27 February, some three and a half months after lunar capture.

    Status Reports Coverage

    The period from lunar capture up to reaching the operational orbit is covered in the status reports no. 31 to no. 35


    Last Update: 03 Aug 2006

    • Shortcut URL
    • http://sci.esa.int/jump.cfm?oid=39719
    • See also
    • SMART-1 Status Reports

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions