Mission operations of the Herschel space observatory continued nominally during the reporting period, with the spacecraft and subsystems all performing as expected.
Report for the period between 5 February and 3 March 2012
This reporting period covers four weeks of Venus Express operations. It includes routine planned operations at moderate but increasing telemetry downlink data rates, the start of the twentieth eclipse season, and two orbit correction manoeuvres.