|
|
| No. 136 - End of Conjunction Phase Operations |
Report for Period 15 June to 21 June 2008 The reporting period covered the last days of solar conjunction phase operations (ending on 19 June), the reconfiguration of the solid state mass memory (SSMM) and the resume of science activities.
Commanding tests and recording of open loop data continued until the exit from the conjunction phase. |
| Date: 24 Jun 2008 |
|
|
| No. 135 - Conjunction Phase Operations |
| Report for Period 8 June to 14 June 2008 The reporting period covered conjunction phase operations. During this phase, groundstation pass operations are reduced: no science activities are carried out, no solid state mass memory (SSMM) dumping takes place. |
| Date: 17 Jun 2008 |
|
|
| No. 98 - Passive Cruise |
Report for Period 10 May to 6 June 2008 Rosetta is continuing its fourth orbit around the Sun as part of its interplanetary journey. The spacecraft distance from the Sun will now increase to reach a maximum of about 2.26 AU in December 2008. |
| Date: 10 Jun 2008 |
|
|
| No. 134 - Conjunction Phase Operations |
Report for Period 1 June to 7 June 2008 The reporting period covered conjunction phase operations. During this phase, groundstation pass operations are reduced: no science activities are carried out, no solid state mass memory (SSMM) dumping takes place. |
| Date: 10 Jun 2008 |
|
|
| No. 133 - Start of Conjunction Phase Operations |
Report for Period 25 May to 31 May 2008 Operations have been nominal during the reporting period. The conjunction operations started on 30 May.
|
| Date: 03 Jun 2008 |
|
|