| No. 132 - Routine Operations |
Report for Period 18 May to 24 May 2008
Routine operations continued nominally as planned.
|
| Date: 27 May 2008 |
|
|
| No. 131 - Trajectory Control Manoeuvre |
Report for Period 11 May to 17 May 2008 Operations have been nominal during the reporting period. Four passes were split into two parts in order to allow ground station support for Phoenix delta DORs. On 16 May, a trajectory control manoeuvre (TCM) was successfully performed. Telecommunication bit rate was decreased in preparation for the upcoming superior conjunction phase. |
| Date: 20 May 2008 |
|
|
| No. 130 - Routine Operations |
| Report for Period 4 May to 10 May 2008
Routine operations continued nominally as planned. |
| Date: 13 May 2008 |
|
|
| No. 97 - Passive Cruise |
Report for Period 12 April to 9 May 2008 Rosetta is continuing its fourth orbit around the Sun as part of its interplanetary journey. The spacecraft distance from the Sun will now increase to reach a maximum of about 2.26 AU in December 2008. |
| Date: 13 May 2008 |
|
|
| No. 129 - Routine Operations |
Report for Period 27 April to 3 May 2008 Operations have been nominal during the reporting period. During this week the new on-board control procedure (OBCP) to enable/disable the routing of virtual channel zero (VC0, for spacecraft housekeeping telemetry) was routinely used. |
| Date: 06 May 2008 |
|
|