• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • Services

    • Missions
    • Show All Missions
    • Archives
    • News Archive
    • Science Results
    • Multimedia Gallery
    • Publication Archive
    • Status Report Archive
    • Journal Archive
    • Calendar of Events
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    Journal Archive

    Search Results:

      | 1 |   [Refine Search]
    2 items found  page 1 of 1
    #01: Payload Module vibration testing completed
    This is the first entry in the Gaia Test Campaign Journal, a series of articles covering the main events during the integration and testing of the Structural Model (SM) and the Proto-Flight Model (PFM) of the Gaia spacecraft. The journal is expected to run until the completion of PFM testing; shortly after this, the Gaia Launch Campaign Journal will begin.
    Date: 23 Aug 2011
    #01: Structural and Thermal Model of the Mercury Planetary Orbiter arrives at ESTEC

    This is the first entry in the BepiColombo Test Campaign Journal, a series of articles covering the main events during the integration and testing of the Structural and Thermal Models (STM) and the Proto-Flight Models (PFM) of the four major components that make up the BepiColombo composite spacecraft stack. The journal is expected to run until the completion of PFM testing in the fourth quarter of 2013; shortly after this, the BepiColombo Launch Campaign Journal will begin.

    Date: 05 Aug 2011
     
      | 1 |   [Refine Search]
    2 items found  page 1 of 1
     


    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions