• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • Services

    • Missions
    • Show All Missions
    • Archives
    • News Archive
    • Science Results
    • Multimedia Gallery
    • Publication Archive
    • Status Report Archive
    • Journal Archive
    • Calendar of Events
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    Journal Archive

    Search Results:

      | 1 |   [Refine Search]
    2 items found  page 1 of 1
    Herschel Telescope Testing
    The last two weeks have seen several testing activities around the Herschel telescope flight model in the cleanroom facilities at ESTEC. On 4 and 5 February the M1/M2 distance measurements of the telescope was performed. These M1/M2 measurements are to verify the optomechanical stability of the telescope under ambient conditions before launch. They are performed before and after significant mechanical and environmental testing, transport and handling activities of the telescope.
    Date: 18 Feb 2008
    Herschel Telescope Flight Model at ESTEC
    The Herschel telescope's primary mirror is the largest mirror ever built for space. It is made out of 12 silicon carbide (SiC) petals brazed together and coated with a thin aluminium reflective layer. The SiC provides a rigid but lightweight structure with the telescope mass totalling at about 320 kg.
    Date: 01 Feb 2008
     
      | 1 |   [Refine Search]
    2 items found  page 1 of 1
     


    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions